Built to order

A quoting tool that answers in the truck

A post-frame builder was quoting on Sunday nights: a spreadsheet, a catalog, and three hours a quotation. This replaced it.

3 hourswhat a quotation took him
10 minuteswhat it takes now

Three screens — the spec, his own cost table, and every proposal he has ever sent. They are wired together, so change a steel price on one and the proposal on another moves while you watch.

The numbers here are made up. The real one prices against that builder's material costs, his labor rate and his margin, and keeps them on the server where a customer cannot read them out of the page. What is honest here is the shape: the same scope letters, the same cost rows, the same four states a proposal can be in.

The specification

The building

Colors

Doors and windows

Site and slab

Insulation and venting

Lean-to

The proposal New proposal

In the real one this prints as a signed document with the scope letters intact, so a change order six weeks later can cite Scope D and mean something. Proposals are encrypted at rest and sent from the dashboard.

What comes out

The proposal above, printed. Scope letters intact, so a change order six weeks later can cite Scope D and mean something. This is the Kestrel job from the log — open P-2026-0147 in the builder and you are looking at the same document.

(918) 555-0142
1140 County Road 42 · Tahlequah, OK 74464

Example proposal

Post-frame building

Kestrel Equipment · Muskogee, Oklahoma

P-2026-0147
September 18, 2026

48′ × 72′ × 16′ eave · 14′ × 14′ overhead doors · lean-to 12′ × 72′

Scope A — Site and foundation$33,034

Level and grade the siteCut, fill and grade to level$2,200

Slab, 5″3,456 sq ft, 4,000 PSI, fiber mesh$25,056

Power-trowel finish3,456 sq ft$2,938

Concrete apron400 sq ft at the doors$2,840

Scope B — Structure$15,425

Laminated columns on brackets20 columns, 10 bays at 8.0 ft$4,110

Trusses10 at 48 ft span, 4/12 pitch$6,720

Wall girts1,920 lin ft$1,632

Roof purlins1,821 lin ft$2,459

Splash plank240 lin ft treated$504

Scope C — Roof and walls$58,395

26-gauge steel, roof and walls8,085 sq ft$27,070

Wainscot36″ band, contrasting color$2,678

Trim and flashingCorners, eave, rake, base, J-channel$4,385

Erection labor3,456 sq ft under roof$24,261

Scope D — Openings$8,447

2 × 14′ × 14′ overhead doorSteel, insulated track$4,952

Insulated door panels2 doors$640

Openers2 chain drive, two remotes each$1,090

1 × walk door3′ × 6′8″ insulated steel, lockset$690

Half-glass1 door$145

2 × window4′ × 3′ slider, screen and trim$930

Scope E — Insulation and ventilation$15,571

R-10 blanket8,085 sq ft$10,915

12″ overhangsEaves and gables$3,000

Vented soffit144 lin ft$972

Vented ridge72 lin ft$684

Scope F — Lean-to$19,008

Lean-to12′ × 72′, open, matching steel$19,008

Delivery and overhead$22,482

Total$172,362

Signature ____________________________ Date ______________

Ridgepole Post-Frame Co. is not a real company. A sample from a demonstration; the prices are illustrative.

Download it as a PDF

Signed, dated, and sent from the dashboard — not retyped into Word, not rebuilt from a spreadsheet, and not different from the one before it because it was late and somebody was tired.

Every number on it was priced by the same model running on this page. Change a rate on the Costs tab and the document changes with it.

What this actually is

Sixty-one thousand lines of it, built for one builder in Tahlequah: a public site with a filterable catalog of finished buildings, a budgetary estimator for the people browsing at midnight, this proposal builder, and an owner's dashboard behind it holding jobs, invoices, expenses, crews and the numbers that say whether the year is working.

It is not a template

The options above are post-frame because that is what he sells. Yours would be your options, your price book, your paper. The same shape fits cabinets, fencing, HVAC change-outs, sheds, docks — anything quoted from a specification rather than guessed at.

The price book stays yours

That costs screen is the point. You change a rate; every proposal you write after it is right, and the ones you already sent can be re-priced to see what they would be worth now. Nobody files a ticket, and nobody reads your margin out of the page source.

What it gave him back

Three hours a quotation became ten minutes. At six buildings a week that is most of a working day returned every week — and the quote goes out while the customer is still interested, rather than on the following Sunday.

It keeps working

Steel moves, options change, a crew leaves. The monthly is what keeps the tool true to the business instead of slowly becoming a thing everybody works around. That is the whole difference between software and a spreadsheet.

Quoted against what it has to do Every one of these is different, so every one is priced after a conversation rather than off a list — a build, and then a monthly that keeps it true to the business as prices and options move.

If you quote from a spec and it takes longer than it should, that is the conversation. It starts with your quoting process, not with software.

Talk about yours The rest of the tools